Back to the journal
Creative leadership

An art director’s first week: audit an existing game before changing it

A five-day audit for an incoming game art director: trace decisions, inspect playable screens, understand team needs, and choose the first intervention.

Ziad El Toukhy4 min read
A miniature fantasy landscape rests on a wooden worktable beside tracing paper, clay models, markers, and a magnifying glass, with one component raised in an inspection clamp.
A miniature fantasy landscape rests on a wooden worktable beside tracing paper, clay models, markers, and a magnifying glass, with one component raised in an inspection clamp. AI-generated illustration.

THE SHORT ANSWER

An incoming art director should spend the first week establishing what the game is trying to achieve, why its current decisions exist, and where production needs help. Play the build, trace representative assets into their sources, listen to the team, and separate confirmed problems from assumptions. Finish with a small, agreed intervention and a clear account of what should be preserved.

Day one: establish what you have been asked to change

Joining an existing game means inheriting decisions, relationships, and unfinished work. My recommendation is to treat the first week as an investigation with a defined output: a shared diagnosis and a bounded next step. A new visual direction should require evidence that the current one cannot serve the game.

Ask the game director and producer what prompted the appointment. Is the concern inconsistent execution, an unclear identity, a blocked team, or a change in audience? Establish which decisions you own, which require agreement, and which commitments already constrain the next milestone. Atlassian’s kickoff guidance similarly establishes purpose, roles, and success markers before planning work. [Project Kickoff](https://www.atlassian.com/team-playbook/plays/project-kickoff)

Request the current build, milestone plan, visual references, asset library, and relevant approvals. Write down contradictions without resolving them immediately. If the brief promises a quiet exploration game while the next milestone emphasizes combat, that disagreement needs an owner before it needs a paintover.

    Day two: inspect representative screens in the playable build

    Play before browsing the strongest artwork. Follow an ordinary player route: arrival, first meaningful action, a repeated task, a failure, and a reward. Capture screens with their build identifier and gameplay state. Include an ordinary crowded moment alongside the polished showcase scene.

    Choose screens because they expose different demands on the existing direction. A navigation view, a close interaction, and a reward state can reveal whether the same visual priorities survive changes in camera, density, and pace. This is an audit sample, so avoid turning it into a commission for new representative assets.

    For each capture, record the intended player action, what supports it, what obstructs it, and what remains uncertain. Separate an observable issue, such as an object disappearing behind an overlay, from a preference about its finish. Keep a preservation list too: distinctive shapes, effective staging, and useful visual conventions deserve explicit protection.

      Day three: trace assets and recover the reasons behind them

      Follow a few visible assets back through their editable sources, variants, and approvals. Check whether the reference marked current actually matches the build. Establish whether a discrepancy comes from an outdated export, an intentional exception, an implementation constraint, or an unresolved direction decision. Each explanation calls for a different response.

      Ask whoever made the decision what problem it answered and whether that problem still exists. Record the evidence and confidence level. A remembered conversation can identify someone to consult, but should remain unconfirmed until checked. Avoid converting an inherited compromise into a new permanent rule simply because nobody remembers its origin.

      My documented responsibilities on Sword of Rule span visual development, character and environment direction, UI/UX, the art pipeline, and outsource artists. That breadth illustrates the range of areas this audit should consider; the proposed week here is a recommendation, not a report of that engagement. [Sword of Rule project context](https://ziadeltoukhy.com/#rawa)

        Day four: find the decisions the team is waiting for

        Speak with artists, design, engineering, and production about the same practical questions: what is blocked, what gets reopened, and what information arrives too late? Ask to see one recent example. Make room for private answers; an artist may describe uncertainty differently when the person approving their work is absent.

        Compare these accounts with the screens and asset history. If several artists await approval on the same material treatment, investigate the missing decision before judging their individual execution. If an approved asset changes after integration, inspect the implementation with its owner. A request for more polish may conceal a dependency that polish cannot resolve.

        Sort findings by player impact, recurrence, production dependency, and confidence. Nielsen Norman Group’s usability severity guidance considers frequency, impact, and persistence. Those are useful questions for interface findings; applying them across an art audit is my proposed adaptation, not a validated scoring system for game art. [Severity Ratings for Usability Problems](https://www.nngroup.com/articles/how-to-rate-the-severity-of-usability-problems/)

          Day five: choose one intervention and state what it will prove

          Consider this illustrative exercise: you inherit a fictional exploration game whose collectible containers look inconsistent. Three captured scenes show different lid shapes. The source files reveal two approved versions, and the environment artist explains that one accommodates a particular opening animation. The initial diagnosis of careless style drift is therefore incomplete.

          Propose checking both versions with the animator and designer before authorizing replacements. Preserve the necessary motion clearance, then try one container revision in the captured scenes. The question is whether a shared identifying feature can connect the variants while retaining their functional differences. No player benefit is established until the appropriate evaluation occurs.

          Close the week with a concise audit: what to preserve, confirmed problems, unresolved questions, and the first intervention with an owner and acceptance condition. State which evidence would change your recommendation. The director’s first useful contribution is a decision the team can act on with a clear reason behind it.

            Key takeaways

            • Agree on the appointment’s purpose, decision authority, and milestone constraints before proposing visual changes.
            • Inspect ordinary gameplay states and record what already works alongside problems.
            • Trace discrepancies through sources and approvals before diagnosing inconsistent art direction.
            • Use concrete examples to distinguish team skill needs from missing decisions and implementation dependencies.
            • End the week with one bounded intervention, an owner, and an explicit acceptance condition.

            Sources & further reading

            ABOUT THE AUTHOR

            Ziad El Toukhy

            Art Director & Creative Lead based in Cairo, with 6+ years across PC, mobile, and VR. His work spans Sword of Rule at Rawa Games, creative direction at YUR, the Nanotopia mobile portfolio, and Mossbrook, his own cozy mobile game. He brings sustained, hands-on creative leadership to studios across Egypt, MENA, and worldwide.

            Prepared with AI assistance from a curated editorial brief, public project information, and the cited sources. Automated checks confirm every source link resolves and verify structure and attribution; suggestions are guidance, not measured project outcomes.

            Keep exploring

            All articles